The company building our
local wind farm arranged a bus tour of the work so far, plus the opportunity to get close to one of the turbines. They had free food and real coffee, and face-painting for kids. They chartered a 55-seat bus for the tour. How many people do you think wanted to attend?
I rang up to book seats the day I heard about it, and the person I spoke to was surprised that at that stage they had over 100 bookings, so would have to run the bus twice. So we made it onto the second bus load,
and after us the bus made a third trip. And beyond that there were people who missed out all together, and will have to wait until the opportunity is repeated some time.
Since I showed the first turbine assembled back in
January, a few more have been erected:
Mount Buninyong in the distance. Of the eventual total of 38, 13 turbines are up so far, with one more like this:
Unfortunately we didn't get to see a blade being lifted, as it was too windy today! Wind farms have to be in windy places to generate power, but they need still days for the construction cranes to work.
Highlight of the tour was getting out of the bus and standing under one of the completed turbines.
It is tall! The tip of the top blade is 160 metres from ground level.
It was a very interesting tour, with the chance to ask questions as well as see the work up close. The turbines are all on private land, so these events are the only chance to get up close to them.