House number installed:
Note the strange box on a stick in the background.
It's our meter box:
No electricity yet, but it's all ready for the connection.
What we are doing this weekend:
Leveling another eight square metres of gravel. This time it's "crusher dust" which goes over the last lot of gravel. The tank will sit on this stuff.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment